Negotiable
The date of payment from buyers deliver within days
Zhejiang
Long-term effective
2018-12-12 03:25
449
Company Profile
Ruian Xinda Packing Machinery Co.,LtdBy certification [File Integrity]
Contact:xindamachine(Mr.)
Email:
Telephone:
Phone:
Area:Zhejiang
Address:Zhejiang
Website:http://www.xinda-mech.com/ http://xindamachine.haoankj.com/
Product name: SS-3200 PP SPUNBOND NONWOVEN FABRIC MAKING MACHINE
I.process flow:
Feeding→Extrusion Melting→filtering→metering→spinning→Cooling→Stretching →Web spreading→Thermal bonding→slitting→collecting
II. Product characteristic:
2-1 Product PP spunbonded nonwovens
2-2 Product width:3200mm (final nonwoven product)
2-3 Product gram 14-120 g/m2
2-4 Filament titer: ≤2.5 Denier
2-5 Production capacity:18T/Day (Based on fabric≥40g/m2 )
III. raw material specification
3-1 Melting index (g/10min)20-40
3-2 Melting point(0C)165
3-3 Molecule uniformity degree(%) >95
3-4 Gray proportion(PPM) <200
IV.Utilities
4-1 Electricity: 1312KW for full line,working power: 495KW
SN |
Main electric equipment |
Working power |
Coefficient |
1 |
Feeding Fan |
5.5KW×2 |
0.5 |
2 |
Master match meter |
0.75 KW×6 |
0.4 |
3 |
Extruder |
110 KW×2 |
0.4 |
4 |
Metering Pump |
5.5 KW×2 |
0.5 |
5 |
Hot oil cycle system |
4 KW×4 |
0.6 |
6 |
Web former & preheating roller |
36 KW×1 |
0.3 |
7 |
Calender |
22 KW×2 |
0.5 |
8 |
Oil cycle system |
5.5KW×1 |
0.6 |
9 |
Rewinder |
15KW×1 |
0.6 |
10 |
Slitter |
11KW×1 |
0.3 |
11 |
Side cooling blower |
75KW×3 |
0.4 |
12 |
Suction blower |
55KW×1 |
0.50 |
13 |
Cooling system |
100KW×1 |
0.5 |
14 |
Water cooling towel |
15KW×1 |
0.6 |
15 |
Calciner |
38 KW |
0.3 |
16 |
Ultrasonic cleaner |
2 KW |
0.4 |
17 |
Electric block |
2 KW |
0.2 |
18 |
Workshop lighting |
10KW |
0.5 |
19 |
Heating system |
492 KW×1 |
0.4 |
20 |
Scrap recycle extruder |
18.5 KW×2 |
0.3 |
4-2 Water: 160m3/hr circulation water, 1T/day consumption
4-3 Compressed air: 1m3/min. pressure 0.8Mpa
4-4 The buyers’ responsible part:
A.Plant building: 25x12x11 M
B.The power sent to each equipment controlled cabinet
C.Water sent to the equipment and the lighting Configuration of the plant
D.The stuffs, hoisting equipment and installation material and equipments required
during installation.
(Buyer should supply accommodation and salary of supplier’s technicians.)
V. Detailed image
Fine quality management pay attention to every detail of the equipment manufacturing process
We have established stringent spare parts quality management standards, some key spare parts use well-known foreign brands to ensure he high performance of each machine, low figure rate, durability, simple and convenient operation and maintenance, every detail from the customer’s consider the angle
http://www.xinda-mech.com/